Featured Projects

AJ's Pizza

Aaron Melvick, owner of AJ’s Pizzeria Restaurant purchased the former Pizza Hut property and intends to complete a beautiful redesign and remodel as shown.  The existing building footprint is 1,737 SF. The remodel will add 506 SF for a total of 2,243 SF of floor area which will accommodate 50 occupants for indoor dining.  The outdoor dining patio will accommodate 17 occupants with a stunning view of Pikes Peak.AJs Pizza

Trailhead Townhomes

Habitat for Humanity broke ground on nine new duplexes east of the Valley View Apartments.  Trailhead Townhomes are using insulated concrete forms (ICF) in place of a stick-built approach. With the escalating cost of lumber, ICF has proven to be financially beneficial. The first duplex should be completed in three months and the second duplex will have its Certificate of Occupancy before the end of 2021.Trailhead Townhomes

Rampart Village Townhomes

Rampart Village Townhomes will consist of 4 duplexes (8 attached single-family units) on 0.92 acres with a legal description of Lots 3-6, Block 9, Fosters Addition INCL ADJ N2 VAC Chester Avenue. as DESC at 590995 (311, 321,331,341,351, 361, 371, & 381 Baldwin Street) in the Community Commercial (CC) zone district.Rampart Village

Black Hills Energy

This will be an office building and laydown yard for the storage of equipment essential to the daily activities of Black Hills Energy. The project is located at the end of Tamarac Parkway on 3.72 acres (three lots)  in the Heavy Service Commercial Light Industrial (HSC/LI) zone.  Lots 1 and 2 will accommodate a 25-foot wide driveway (plus grading and drainage) from the cul-de-sac to Lot 3 within the platted 50’ wide ingress, egress, and utility easement. Lot 3 will contain a 4,000 SF, 22-foot high office building with an adjacent exterior 18,900 SF fenced laydown yard, and a 6-stall on-site parking lot. Black Hills Energy