https://www.codot.gov/projects/us24-woodland-park-resurfacing https://www.codot.gov/projects/us24-woodland-park-resurfacing
CDOT US 24 Resurfacing Project - Woodland Park
Location: US 24 through Woodland Park
Duration: Spring - Fall 2023
Impacts: Expect traffic impacts and use caution while daytime and overnight construction occurs.
The Colorado Department of Transportation along with contractor Kiewit, will begin installing ADA (American’s with Disabilities Act) curb ramps in Woodland Park. Resurfacing US 24 between Divide and Chipita Park will start at the beginning of July. Other improvements include installation of guardrail, construction of embankment protectors, replacement of two traffic counters and signing/striping along the Highway 24 corridor. The anticipated completion date of the project is November 2023.
Information about this project will be updated as provided by CDOT.
Disclaimer: This is not a City of Woodland park project. For specific questions about this project, please visit the CDOT website.
Forty-four ADA curb ramps will be installed in Woodland Park at the following locations:

- US 24 and Lafayette Ave
- US 24 and Browning St
- US 24 and Elm St
- US 24 and Maple St
- US 24 and Midland Ave
- US 24 and Pine St
- US 24 and Center St
- US 24 a Park St
- US 24 and Fairview St
- US 24 and Grace St
- US 24 and Pike Peak Ave
- US 24 and Chester Ave
- US 24 and Sonic/McDonalds Alley
- US 24 and Paradise Circle North
- US 24 and Trull Rd.
- US 24 and Morning Sun Dr.
Paving and Millling on US 24 begins Wednesday, July 5
Work Schedule & Traffic Impacts:
Nighttime work: 7 p.m. To 7 a.m.
Alternating and single lane closures
Speed limit reduced to 45 MPH through the constuction zone.
As always, construction schedules may be impacted by weather and other unanticipated delays. Please be sure to look at https://subscription.cotrip.org for current information.
Project Hotline: 719-751-7098
Project Email: us24pavingandadaimprovements@gmail.com